A secure destination
A stable, long-term destination for the canton’s trash, without relying on landfills that close. 1
Municipalities & institutions
What you need to know to decide: what the canton gains, the fact sheet, the legal framework and how to start the conversation.
What the canton gains
Central Valley landfills are at their limit and fees have already gone up in several cantons. Orchidean One offers stability.13
A stable, long-term destination for the canton’s trash, without relying on landfills that close. 1
A per-tonne fee equal to or below what the canton pays today to haul its trash to Guápiles or Puntarenas, under a long-term contract with no sudden hikes like those of 2025–2026. 2
Shorter trips that cut transport costs and fleet wear. 4
Moves up Law 8839’s hierarchy: less final disposal, more recovery. 5
Reports on tonnes delivered, energy generated and emissions, ready for the council and the Comptroller.
The investment is 100% private, by ReEnergy. Neither the State nor the municipality puts in a single colón.
Already on board
The project has been presented to municipalities and the Ministry of Health. These have signed (non-binding) letters of interest:
Fact sheet
For technical reports, council sessions and legislative committees.
| Facility type | Waste-to-energy plant for ordinary municipal solid waste |
|---|---|
| Technology | Belgian-designed moving multi-stage grate, with boiler and steam turbine |
| Capacity | 1,000 t/day |
| Electrical output | 20 MW net |
| Equivalent | ~50,000 homes* |
| Combustion temperature | 850–1,100 °C (gases ≥ 2 s above 850 °C) |
| Flue-gas treatment | NOx control, acid neutralization, activated carbon and bag filter* |
| Emissions design standard | Directive 2010/75/EU and Decree 39136-S-MINAE |
| Monitoring | Continuous measurement, published online and on public screens outside the plant and at the municipalities |
| Audits | Independent and regular, with public results |
| Volume reduction | ~90% |
| Ash | Bottom ash reusable in construction; fine ash under controlled handling (Ministry of Health) |
| Location | First plant: Cartago · Second: Alajuela |
| Land | 10 ha minimum |
| Studies and permits | 6-month target |
| Construction | 18–22 months after permits |
| Employment | ~150 permanent jobs |
| Investment | 100% private, by ReEnergy. No public funds |
| Municipal fee | Per tonne, equal to or below what it costs today to haul trash to Guápiles or Puntarenas |
| Waste study | Under way: moisture and heating value of Costa Rican waste |
* Estimate, subject to detailed engineering and the ongoing waste study.
Legal framework
Integrated Waste Management. Hierarchy: avoid, reduce, reuse, recover (including energy recovery), treat and dispose. 5
Operating conditions and emissions control for thermal treatment of ordinary solid waste (2015). 6
Environmental impact assessment: D1 form, Environmental Impact Study and environmental approval. 7
Land-use certificate under the zoning plan, and building permits.
Firm power also adds security to the national grid, which in 2024 saw blackouts and high spending on thermal generation and imports.9
Let’s talk
We present the project to mayors, councils, municipal federations, committees and technical teams.