Industrial zone
On industrial or compatible land under the canton’s zoning plan.
Where and when
A compact plant, in an industrial zone, with every legal permit, built on a short timeline because its design is already proven.
* Estimated timeline, subject to SETENA and municipal review times.
Where
Orchidean One will be built in Cartago, the province that lost its Los Pinos landfill in 2023 and now hauls its trash far away. A second plant is planned in Alajuela.1
The exact site is chosen through technical studies and public consultation. These are the six rules, and they’re non-negotiable:
On industrial or compatible land under the canton’s zoning plan.
With a green buffer strip between the plant and any housing.
Away from parks, refuges, wetlands and aquifer recharge zones.
Direct access to main roads, so trucks don’t cross neighborhoods.
Close to a substation, to deliver power without major works.
With favorable geological and seismic studies, as the Seismic Code requires.
When
Every step follows Costa Rican law: SETENA for the environment and the municipality for land use.2
Underway
A study of the country’s actual waste is under way. The project has been presented to municipalities and the Ministry of Health, and several municipalities have signed letters of interest.
Target: 6 months (phases 1–3)
D1 form and Environmental Impact Study, with public participation, through to environmental approval.
Target: 6 months (phases 1–3)
Land-use permit, building permits and grid connection agreement.
18–22 months
Civil works and equipment manufacturing in parallel. Priority for local workers.
Phase 5
The plant takes trash, delivers electricity and publishes its emissions on this site and on public screens.
Why it’s fast
Every permit is met. What shortens the timeline is that the technology doesn’t need inventing.
One informed person is worth a thousand rumors. Send this link to your family, your neighborhood group or your local council.